UNIVERSAL HIGHWAYS
  Road Marking, Line Marking, UV Floor Coatings 
Menu Services Gallery Our Team About Us News Links Contact Us Floor Coatings

NEWS - Completed Line Markings, Road Markings and General Surface Marking Projects

September 2014
Work in progress at New Cross Hospital Wolverhampton, these Works are now completed. The works were to six levels with the basement levels done in two pack epoxy
September 2014
Work in progress at Basford Bridge Nottingham, we were commissioned to apply a non slip coating on a steel bridge.
September 2014
Refresh the Disabled bays at Designer Outlet Mansfield
September 2014
Recent Works at Falkirk Scotland. Works included all levels, 9 levels in total
September 2014
The works were a multi storey car park in Dundee the works were to 4 level and completed in one day including travelling to Dundee from Lincolnshire. We stayed overnight and then the next day we went to Irvine and completed another multi storey car park

 
Dundee Car Park 3 Dundee Car Park 2
Dundee Multi Storey Car Park
July 2013
Major Line Painting work conducted by Universal Highways at Argos Magna Park. Click to download the Marketing Update

Line Painting at Argos Magna Park
January 2013
works at Luxus Industrial Coatings to Walls


December 2012
First Job done in the UK using our new Water Based Two Pack. Completely Solvent Free and dries within Two hours. A New Product for the Warehouse Environment where time is paramount to handing back to the client


November 2012
We at Universal are still pushing the boundaries' in UV technology, we were asked if we could recommend a coating for the tops of two bars at a social club that would improve hygiene, once again we recommended UV Primer and Top coat, a product with no bacterial loading, the finish we achieved is clearly amazing.
November 2012
RTW WORKSHOPS on concrete and clear coatings on WOOD SORTING OFFICES

              
August 2012
After carrying out demonstrations of our instant lines product 10 months ago, we have now got approval for station platforms. Our demo site has shown no signs of wear and we are now awaiting the order for 200 stations
August 2012
The summer holidays are with us again, we at Universal Highways offer our clients Play Ground Markings at reasonable cost, we can under cut most companies as our technicians' are highly skilled and carry out the works by machine and not costly thermosplastic preform.

      
June 2012
12 Dock Loaders for the Post Office Southampton

        
May 2012
Contract Heinz Warehouse Wigan

           
May 2012
Poole Post Office VMU Bay Works 780m2, Finished May, Ready for Monday Morning 14th May

             
January 2012
UV Floor coatings, the future for your work place whilst saving you money. Post Office project in Cornwall, works carried out while the workshop was still in use, minimum disruption to your work force and instant hand back when finished, six ramps completed whilst normal works carried on over two days. 
 
January 2012
Red & Grey UV Flooring, Kettering - Wincanton 
 
January 2012
UV Floor Coatings at Tripack 
January 2012
works carried out at the Post Office Green Safety walkways with Logos in Full UV Paint Instant Cure 
    
August 2011
Universal Highways Purchased this new Movano large van allowing us to carry all equipments for UV Floor Coatings without hiring, when loaded from our premises, we can carry everything for three weeks working away from our depot

    
 
October 2011
40 installations nationwide to Post Offices. Universal Highways have just secured the preferred contractor for the Wincanton Group estimated spend 200k annualy

         
August 2011
New Helipad in Peterborough 
June 2011
Schothorst Feed Research in Holland. Universal Highways undertook the install of the UVOLVE Calrity system with anti slip properties to test the long tern effects on the livestock when the flooring has a coating rather than bare concrete. The benefits should be from reduced bacterial loading, ease of clean, reduced animal injury due to slips on fecal matter etc. The tests will take 12 months and will be in conjunction with DSM. The aim would be to prove that the system really adds benefit to the livestock's environment and life, there are over 15 million square metres of Broiler Chick sheds just in Holland and each one is a potential customer.

         
June 2011
Multi Storey Car Park Floor. Single Pack Epoxy - Ashford in Kent 
June 2011
UV Floor Coating with Anti Slip Additive - Trial for a Local Authority in London 
June 2011
Floor Coating in Red in a Church in Jondon 
 
July 2011
New Contract started at a factory in Grimsby, first phase creating fork lift truck route. When complete further works up to Christmas to coat the remaining floor area in Grey around the machines when shut down 
 
July 2011
New Website Launched 
 
July 2011
We have just started a £140,000.00 contract in Nottingham at a Clothing warehouse
 
July 2011
Currently working in Redcar, Peterborough, Richmond, Kettering and Grimsby 
 
   
   
   
   
   

[Home] [Services] [Gallery] [About Us] [Links] [Our Team] [News] [Contact Us]
(c) Universal Highways 2012 - Website created by ProComp Solutions Ltd